Advanced TSO control rooms to enhance grid observability, stability and resilience
Horizon Europe · Cluster 5 – Climate, Energy and Mobility · HORIZON-CL5-2027-07-D3-25
Funding for advanced control room solutions that help electricity transmission operators manage congestion, renewables and resilience.
Evaluar esta convocatoria para mi proyectoObtener ayuda con esta convocatoria
Esta convocatoria está anunciada, pero todavía no está abierta. Las fechas y las condiciones aún pueden cambiar.
¿De qué trata esta convocatoria?
The call funds pilots of advanced control room solutions for electricity transmission system operators, improving grid observability, congestion management, renewables integration and interoperability.
¿Qué financia esta convocatoria?
Scope
This Horizon Innovation Action modernises the design and operation of transmission system operator (TSO) control rooms, combining hardware and software for better observability, more automation, faster decisions and fewer errors.
Expected activities
- Design and test innovative solutions, technologies and processes for TSO control rooms, including wide area monitoring systems where possible.
- Help operators manage congestion and integrate more renewables with less curtailment, using real-time analytics and smart-asset data; solutions may cover preparation for, recovery and restoration after incidents, including extreme weather.
- Update operational tools for distributed generation, possibly with decentralised control.
- Improve forecasting of supply, demand, flexibility, ancillary service needs and hosting capacity, with advanced analytics and visualisation.
- Develop interoperability between control rooms of different TSOs and vendors, and with connected entities including adjacent distribution system operators.
- Use digital twins, artificial intelligence, security by design and, as far as possible, open-source software; produce a manual and best practices for other TSOs.
Expected outcomes
More reliable, resilient and efficient transmission grids, efficient congestion management, better observability and forecasting, and vendor-agnostic reference architectures and tools for control rooms. Activities are expected to reach TRL 6-8 by the end of the project.
¿Cuáles son los datos clave?
- Presupuesto del tema
- 28.500.000 €
- Financiación por proyecto
- 9.500.000 €
- Código de la convocatoria
- HORIZON-CL5-2027-07-D3-25
- Programa
- Horizon Europe
- Expected number of projects
- 3
¿Quién puede presentarse a esta convocatoria?
- Projects are expected to include at least two electricity transmission system operators and at least two universities and/or research organisations.
- Demonstration, testing and validation should take place in at least two pilots in different EU Member States or Associated Countries.
- Collaboration is encouraged with at least one control room technology supplier, at least two connected distribution system operators and at least one project funded under the related topic on advanced distribution management systems.
Comprueba tu admisibilidad y cómo encaja tu proyecto
En tu cuenta gratuita, comparamos los datos de tu organización con las condiciones de admisibilidad de los documentos de la convocatoria y evaluamos cómo encaja tu proyecto con ella.
¿Qué se espera de las propuestas?
- Selected projects are expected to contribute to the BRIDGE initiative.
¿Cuándo termina el plazo?
1 de diciembre de 2027 (390 días)
1 December 2027 (single-stage submission). Planned opening date: 4 August 2027.
¿Te interesa esta convocatoria? Resumen elaborado con IA a partir de los documentos oficiales de la convocatoria. Algunos detalles pueden variar, así que consulta la página oficial de la convocatoria antes de presentarte. Lee los documentos oficiales de la convocatoria antes de decidir. El texto oficial es siempre el vinculante.