Bandi aperti › Horizon Europe

Aperto

Efficient energy input from renewable sources and energy management in the process industries (IA) (Processes4Planet and Innovative Advanced Materials for the EU partnerships)

Horizon Europe · Cluster 4 – Digital, Industry and Space · HORIZON-CL4-2027-02-MAT-PROD-32-TWO-STAGE

Funding to cut process industry emissions by at least 20% through renewable energy input, storage and smarter energy management.

Valuta per il mio progettoRicevi aiuto per questo bando

Di cosa tratta questo bando?

The topic funds projects that decarbonise the process industries through renewable energy input, energy storage and integrated energy management, demonstrated at pilot scale. It targets industrial consortia in energy-intensive sectors.

Cosa finanzia questo bando?

Scope

The topic funds innovation that cuts the carbon footprint of the process industries by at least 20%, through electrification and other renewable energy sources, lower energy demand, energy efficiency and energy integration. Projects should take the variability of renewable energy into account and develop solutions that include novel storage technologies relevant to the process industries. Pure demand-side management through adapted production schedules is outside the scope.

Areas proposals should address (several of the following)

  • Greater use of renewable energy in production processes with improved efficiency.
  • Integrated energy systems with novel storage so plants run smoothly despite variable renewable supply.
  • Solutions for low and medium temperature (100-500 °C) energy inputs, including hybrid solutions that progressively reduce fossil fuel use.
  • Solutions for high temperature (above 500 °C) inputs, including electrified processes and high-temperature storage.
  • High-performance insulation and new advanced materials for heat capture, storage and retrieval that minimise critical raw materials and can be recycled.

Requirements

  • Pilot-scale demonstrations, preferably in real industrial environments.
  • A business case, exploitation strategy and exploitation plan with feasibility study, business plan and financial model, naming possible funding sources such as the Innovation Fund, InvestEU and cohesion funds.
  • A greenhouse gas avoidance methodology is recommended.

Technology readiness

Activities start at TRL 4-5 and reach TRL 6-7. The topic implements the Processes4Planet and Innovative Advanced Materials for the EU partnerships.

Quali sono i dati principali?

Budget del topic
52.500.000 €
Importo minimo per progetto
7.000.000 €
Importo massimo per progetto
9.000.000 €
Codice del bando
HORIZON-CL4-2027-02-MAT-PROD-32-TWO-STAGE
Programma
Horizon Europe
Expected number of projects
6

Chi può candidarsi a questo bando?

  • Pure demand-side management by adapting production schedules is not eligible.

Verifica la tua ammissibilità e quanto è adatto il tuo progetto

Nel tuo account gratuito verifichiamo i requisiti di ammissibilità sui documenti del bando per la tua organizzazione e valutiamo quanto il tuo progetto sia adatto a questo bando.

Crea un account gratuito per verificare la tua ammissibilità

Quando scade il bando?

2 febbraio 2027 (89 giorni)

Two-stage submission: first stage 2 February 2027, second stage 2 September 2027.

Ti interessa questo bando? Sintesi redatta con l’IA a partire dai documenti ufficiali del bando. Alcuni dettagli possono differire, quindi controlla la pagina ufficiale del bando prima di candidarti. Leggi i documenti ufficiali del bando prima di decidere. Fa sempre fede il testo ufficiale.

Pagina ufficiale del bando ↗

Fonte: portale Funding & Tenders dell’UE e documenti ufficiali del bando. Pagina ufficiale del bando Ultimo aggiornamento: 6 ottobre 2026.